Reardon Rectory Construction Updates

Starting on the lower level of the church, the Saint Cecilia room is nearing completion as it will be ready to paint sometime this week. The first and second floors are currently having fire protection and ductwork installed in their southeast wings and temporary protection in the southwest wings as construction continues throughout the building.

On the north side of the third floor, all framing, drywall, taping, and mudding will be competed by the end of the week. While the south side is nearing completion, the construction team is currently looking for flooring samples to match the rest of the rectory.

The fourth floor continues to be transformed from an unused attic to adequate office space and gallery for The Basilica’s extensive art collection. The walls and the ceiling will be installed throughout this week.

The Basilica’s staff is excited for all the new changes and can’t wait for everything to get back to normal. A special thanks goes out to Mortenson Construction for working so diligently and respectively over the last few months. 

Categories: 

Add new comment

Plain text

  • No HTML tags allowed.
  • Web page addresses and e-mail addresses turn into links automatically.
  • Lines and paragraphs break automatically.
2 + 1 =
Solve this simple math problem and enter the result. E.g. for 1+3, enter 4.